We were back at Haslar early in the year to put in a new Pier G, and installed the new pontoons for Pier M. The latter now acts as a floating breakwater in an exposed area close to the harbour entrance as well as being available as temporary berthing for larger boats. Finally we delivered the base for a new toilet bloc base measuring 20 metres by 8 metres, built using Waliflotes to handle the heavy equipment. It was assembled at Woolston and towed to Haslar where the toilet portacabin was lifted on to the base prior to fitting out.