Marina infrastructure engineered for long-term performance

More than six decades of marina engineering Since 1963, Walcon has designed, manufactured and installed marina and harbour infrastructure across the UK and internationally – from private jetties to complete marina developments.

From design and manufacture through to piling and on-water installation, every stage is handled in house. Purpose-built UK facilities, a dedicated installation fleet and experienced crews help maintain control over quality, programme and delivery.

Design

Design

We develop marina and berthing layouts around each site, its conditions, tides and vessel mix – from initial concept through to detailed technical drawings.

Design and engineering →
Manufacture

Manufacture

Pontoons and marina infrastructure are manufactured at our purpose-built UK facilities, giving us close control over materials, quality and production.

Marina manufacture →
Install

Install

Our in-house crews, dedicated barges and specialist equipment provide piling and on-water installation across the UK and internationally.

View our projects →
1963Founded
100,000+Berths delivered
30+Countries served
c.30%International work
Meet us at Metstrade 2026, stand 09.421
Latest update

Meet us at Metstrade 2026, stand 09.421

31 October 2026

We'll be at Metstrade in Amsterdam on 17–19 November, on stand 09.421 with our long-standing Benelux partners W2 Support. We're arranging meetings throughout the event, so if you'd like to book a time to discuss your marina project, email sales@walconmarine.com.

View on LinkedIn →

Planning a marina or berthing facility?

Talk to our team about the right system for your site, operational requirements and long-term plans.

Discuss your project →