It was good to be back at Dean & Reddyhoff’s Deacons Marina on the River Hamble. This time the project involved extending piers A, B and C out to the existing mid-river pontoons to integrate them into the main marina layout. Two additional pontoons were added to piers A, B and C and six hammerhead pontoons added. This involved moving the original midriver line with the Walcon Wizard manoeuvring within the very restricted space to extract and redrive the piles.